A deterministic and a stochastic multi-stage portfolio model for a hydropower producer operating in a competitive electricity market is proposed. The producer has to cope with a production function constraint imposing the scheduling of his future production. The portfolio includes its own production, a set of energy contracts for delivery or purchase, including derivatives contracts as forwards with physical delivery to hedge against risks. The goal of our models is to maximise the profit of the producer and reduce the economic risks connected to the fact that energy spot and forward prices are highly volatile. We alternatively derive the forward price by the spot dynamics and model forward dynamics obtaining consistent scenarios. Our results show that forward contracts can be used for hedging purposes. Beyond profit, the convenience of using forward contracts is a more efficient use of the hydroplant, taking advantage of the possibility of pumping water and ending up with a higher final value of the reservoir. Finally, we provide performance measures of our threestage model with respect to deterministic one.

Deterministic and stochastic models for hedging electricity portfolio of a hydropower producer

GIACOMETTI, Rosella;VESPUCCI, Maria Teresa;BERTOCCHI, Maria;
2013-01-01

Abstract

A deterministic and a stochastic multi-stage portfolio model for a hydropower producer operating in a competitive electricity market is proposed. The producer has to cope with a production function constraint imposing the scheduling of his future production. The portfolio includes its own production, a set of energy contracts for delivery or purchase, including derivatives contracts as forwards with physical delivery to hedge against risks. The goal of our models is to maximise the profit of the producer and reduce the economic risks connected to the fact that energy spot and forward prices are highly volatile. We alternatively derive the forward price by the spot dynamics and model forward dynamics obtaining consistent scenarios. Our results show that forward contracts can be used for hedging purposes. Beyond profit, the convenience of using forward contracts is a more efficient use of the hydroplant, taking advantage of the possibility of pumping water and ending up with a higher final value of the reservoir. Finally, we provide performance measures of our threestage model with respect to deterministic one.
journal article - articolo
2013
Giacometti, Rosella; Vespucci, Maria Teresa; Bertocchi, Maria; Barone Adesi, Giovanni
File allegato/i alla scheda:
File Dimensione del file Formato  
Giacometti-Vespucci-Bertocchi-BA.pdf

Solo gestori di archivio

Versione: publisher's version - versione editoriale
Licenza: Licenza default Aisberg
Dimensione del file 465.58 kB
Formato Adobe PDF
465.58 kB Adobe PDF   Visualizza/Apri
Pubblicazioni consigliate

Aisberg ©2008 Servizi bibliotecari, Università degli studi di Bergamo | Terms of use/Condizioni di utilizzo

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/10446/30322
Citazioni
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact