February 14th 2013 marked the end of the first period of running of the Large Hadron Collider (LHC) and the start of a two-year break from operation (LS1) aimed at consolidating both the accelerator as well as the detectors. By the end of LS1, the LHC is expected to provide collisions at 13 Tev. While, by 2020, the ultimate instantaneous luminosity is expected to be 10(34)/cm(2)/s. To prepare for this scenario, the Resistive Plate Chamber system at the CMS experiment is planning several detector maintainance and consolidation interventions. These include High Voltage and Low Voltage system reparations, gas leak identification and reparation, signal channel connectivity and functionality. Commissioning and upgrade plans for the existing CMS RPC system are presented here.

(2014). CMS RPC commissioning of the existing detector during the long shutdown [journal article - articolo]. In JOURNAL OF INSTRUMENTATION. Retrieved from http://hdl.handle.net/10446/142648

CMS RPC commissioning of the existing detector during the long shutdown

Vai, I.;
2014-01-01

Abstract

February 14th 2013 marked the end of the first period of running of the Large Hadron Collider (LHC) and the start of a two-year break from operation (LS1) aimed at consolidating both the accelerator as well as the detectors. By the end of LS1, the LHC is expected to provide collisions at 13 Tev. While, by 2020, the ultimate instantaneous luminosity is expected to be 10(34)/cm(2)/s. To prepare for this scenario, the Resistive Plate Chamber system at the CMS experiment is planning several detector maintainance and consolidation interventions. These include High Voltage and Low Voltage system reparations, gas leak identification and reparation, signal channel connectivity and functionality. Commissioning and upgrade plans for the existing CMS RPC system are presented here.
articolo
2014
Cimmino, A.; Ban, Y.; Cai, J.; Li, Q.; Liu, S.; Qian, S.; Wang, D.; Xu, Z.; Zhang, F.; Choi, Y.; Kim, D.; Goh, J.; Choi, S.; Hong, B.; Kang, J. W.; Ka...espandi
(2014). CMS RPC commissioning of the existing detector during the long shutdown [journal article - articolo]. In JOURNAL OF INSTRUMENTATION. Retrieved from http://hdl.handle.net/10446/142648
File allegato/i alla scheda:
File Dimensione del file Formato  
Cimmino_2014_J._Inst._9_C10043.pdf

Solo gestori di archivio

Versione: publisher's version - versione editoriale
Licenza: Licenza default Aisberg
Dimensione del file 670.54 kB
Formato Adobe PDF
670.54 kB Adobe PDF   Visualizza/Apri
Pubblicazioni consigliate

Aisberg ©2008 Servizi bibliotecari, Università degli studi di Bergamo | Terms of use/Condizioni di utilizzo

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/10446/142648
Citazioni
  • Scopus 0
  • ???jsp.display-item.citation.isi??? 0
social impact