We present the status of the commissioning and integration of the GE1/1 slice test detectors into CMS. Ten Triple-GEM detectors were installed at the beginning of 2017 in CMS to obtain installation and commissioning expertise, as well as to demonstrate the integration into the CMS system. The paper will enlight the configuration of the slice test and then focus mainly on the integration activities and status.
(2019). Commissioning and performance of the GE1/1 slice test detectors [journal article - articolo]. In NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH. SECTION A, ACCELERATORS, SPECTROMETERS, DETECTORS AND ASSOCIATED EQUIPMENT. Retrieved from http://hdl.handle.net/10446/143107
Commissioning and performance of the GE1/1 slice test detectors
Vai, Ilaria
2019-01-01
Abstract
We present the status of the commissioning and integration of the GE1/1 slice test detectors into CMS. Ten Triple-GEM detectors were installed at the beginning of 2017 in CMS to obtain installation and commissioning expertise, as well as to demonstrate the integration into the CMS system. The paper will enlight the configuration of the slice test and then focus mainly on the integration activities and status.File | Dimensione del file | Formato | |
---|---|---|---|
1-s2.0-S0168900218313718-main.pdf
Solo gestori di archivio
Versione:
publisher's version - versione editoriale
Licenza:
Licenza default Aisberg
Dimensione del file
1.2 MB
Formato
Adobe PDF
|
1.2 MB | Adobe PDF | Visualizza/Apri |
Pubblicazioni consigliate
Aisberg ©2008 Servizi bibliotecari, Università degli studi di Bergamo | Terms of use/Condizioni di utilizzo