The CMS Collaborationhas been developing large-area Triple-GEM detectors to be installed in the muon endcap regions of the CMS experiment in 2019 to maintain forward muon trigger and tracking performance at the HLLHC. Ten pre-production detectors were built at CERN to commission the first assembly line and the quality controls. These were installed in the CMS detector in early 2017 and are currently participating in the 2017 LHC run. The collaboration has prepared several additional assembly and quality control lines for distributed mass production of 160 GEM detectors at various sites worldwide. During 2017, these additional production sites have been optimizing construction techniques and quality control procedures and validating them against common specifications by constructing additional preproduction detectors. Using the specific experience from one production site as an example, we discuss how the quality controls make use of independent hardware and trained personnel to ensure fast and reliable production. Preliminary results on the construction status of CMS GEM detectors are presented.
(2018). Operational experience with the GEM detector assembly lines for the CMS forward muon upgrade . Retrieved from http://hdl.handle.net/10446/143115
Operational experience with the GEM detector assembly lines for the CMS forward muon upgrade
Vai, Ilaria
2018-01-01
Abstract
The CMS Collaborationhas been developing large-area Triple-GEM detectors to be installed in the muon endcap regions of the CMS experiment in 2019 to maintain forward muon trigger and tracking performance at the HLLHC. Ten pre-production detectors were built at CERN to commission the first assembly line and the quality controls. These were installed in the CMS detector in early 2017 and are currently participating in the 2017 LHC run. The collaboration has prepared several additional assembly and quality control lines for distributed mass production of 160 GEM detectors at various sites worldwide. During 2017, these additional production sites have been optimizing construction techniques and quality control procedures and validating them against common specifications by constructing additional preproduction detectors. Using the specific experience from one production site as an example, we discuss how the quality controls make use of independent hardware and trained personnel to ensure fast and reliable production. Preliminary results on the construction status of CMS GEM detectors are presented.File | Dimensione del file | Formato | |
---|---|---|---|
08532942.pdf
Solo gestori di archivio
Versione:
publisher's version - versione editoriale
Licenza:
Licenza default Aisberg
Dimensione del file
341.02 kB
Formato
Adobe PDF
|
341.02 kB | Adobe PDF | Visualizza/Apri |
Pubblicazioni consigliate
Aisberg ©2008 Servizi bibliotecari, Università degli studi di Bergamo | Terms of use/Condizioni di utilizzo