The CMS Collaboration has been developing large-area triple-gas electron multiplier (GEM) detectors to be installed in the muon Endcap regions of the CMS experiment in 2019 to maintain forward muon trigger and tracking performance at the High-Luminosity upgrade of the Large Hadron Collider (LHC); 10 preproduction detectors were built at CERN to commission the first assembly line and the quality controls (QCs). These were installed in the CMS detector in early 2017 and participated in the 2017 LHC run. The collaboration has prepared several additional assembly and QC lines for distributed mass production of 160 GEM detectors at various sites worldwide. In 2017, these additional production sites have optimized construction techniques and QC procedures and validated them against common specifications by constructing additional preproduction detectors. Using the specific experience from one production site as an example, we discuss how the QCs make use of independent hardware and trained personnel to ensure fast and reliable production. Preliminary results on the construction status of CMS GEM detectors are presented with details of the assembly sites involvement.

(2018). Operational Experience with the GEM Detector Assembly Lines for the CMS Forward Muon Upgrade [journal article - articolo]. In IEEE TRANSACTIONS ON NUCLEAR SCIENCE. Retrieved from http://hdl.handle.net/10446/144958

Operational Experience with the GEM Detector Assembly Lines for the CMS Forward Muon Upgrade

Vai I.;
2018-01-01

Abstract

The CMS Collaboration has been developing large-area triple-gas electron multiplier (GEM) detectors to be installed in the muon Endcap regions of the CMS experiment in 2019 to maintain forward muon trigger and tracking performance at the High-Luminosity upgrade of the Large Hadron Collider (LHC); 10 preproduction detectors were built at CERN to commission the first assembly line and the quality controls (QCs). These were installed in the CMS detector in early 2017 and participated in the 2017 LHC run. The collaboration has prepared several additional assembly and QC lines for distributed mass production of 160 GEM detectors at various sites worldwide. In 2017, these additional production sites have optimized construction techniques and QC procedures and validated them against common specifications by constructing additional preproduction detectors. Using the specific experience from one production site as an example, we discuss how the QCs make use of independent hardware and trained personnel to ensure fast and reliable production. Preliminary results on the construction status of CMS GEM detectors are presented with details of the assembly sites involvement.
articolo
2018
Abbaneo, D.; Abbrescia, M.; Ahmad, A.; Ahmed, W.; Ali, C.; Altieri, P. R.; Amr, M.; Asghar, I.; Aspell, P.; Assran, Y.; Avila, C.; Ban, Y.; Band, R.; Bansal, S.; Bencze, G.; Beni, N.; Benussi, L.; Bhatnagar, V.; Bhopatkar, V.; Bianco, M.; Bianco, S.; Borgonovi, L.; Bouhali, O.; Braibant-Giacomelli, S.; Bravo, C.; Cafaro, V.; Calabria, C.; Caponero, M.; Cassese, F.; Castaneda Hernandez, A.; Cavallo, F. R.; Cavallo, N.; Chen, G.; Chhibra, S. S.; Choi, S.; Colafranceschi, S.; Colaleo, A.; Conde Garcia, A.; Dabrowski, M. M.; Dalchenko, M.; De Lentdecker, G.; De Robertis, G.; Dildick, S.; Dong, J.; Dorney, B.; Endroczi, G.; Erbacher, R.; Errico, F.; Fallavollita, F.; Giacomelli, P.; Gigli, S. G.; Gilmore, J.; Giordano, V.; Gola, M.; Gonzalez Hernandez, C. F.; Gruchala, M.; Guiducci, L.; Gupta, R.; Gutierrez, A.; Hadjiiska, R.; Hakkarainen, T.; Hasbuddin, M.; Hauser, J.; Heidemann, C.; Hoepfner, K.; Hohlmann, M.; Hoorani, H.; Huang, H.; Huang, T.; Iaydjiev, P.; Jha, V.; Juodagalvis, A.; Juska, E.; Kamon, T.; Karchin, P. E.; Kaur, A.; Keller, H.; Khan, W. A.; Kim, J. S.; Kim, H.; Kotsokechagia, A.; Kumar, A.; Kumari, P.; Lee, J. S. H.; Lenzi, T.; Leonard, A.; Leroux, P.; Li, Q.; Litov, L.; Loddo, F.; Lohan, M.; Maerschalk, T.; Maggi, M.; Magnani, A.; Majumdar, N.; Makovec, A.; Malhotra, S.; Marinov, A.; Mccoll, N.; Mclean, C.; Merlin, J. A.; Mishra, D. K.; Mohamed, S.; Mohamed, T.; Molnar, J.; Muhammad, S.; Mukhopadhyay, S.; Naimuddin, M.; Netrakant, P. K.; Nuzzo, S.; Pant, L. M.; Paolucci, P.; Park, I.; Passamonti, L.; Passeggio, G.; Pavlov, B.; Peck, A.; Petrow, H.; Philipps, B.; Piccolo, D.; Pierluigi, D.; Primavera, F.; Purohit, A.; Radogna, R.; Raffone, G.; Rahmani, M.; Ranieri, A.; Rapsevicius, V.; Rashevski, G.; Ressegotti, M.; Riccardi, C.; Rodozov, M.; Romano, E.; Ruiz Alvarez, J. D.; Russo, A.; King, R.; Safonov, A.; Saltzberg, D.; Salva, S.; Saviano, G.; Shah, A.; Sharma, A.; Sharma, A.; Sharma, R.; Shopova, M.; Simone, F.; Singh, J. B.; Soldani, E.; Sturdy, J.; Sultan, A.; Sultanov, G.; Szillasi, Z.; Tavernier, F.; Thyssen, F.; Tuuva, T.; Tytgat, M.; Ujvari, B.; Vai, Ilaria; Venditti, R.; Verwilligen, P.; Vitulo, P.; Wang, D.; Yang, Y.; Yang, U.; Yang, X.; Yonamine, R.; Zaleski, S.; Zenoni, F.; Starling, E. R.
(2018). Operational Experience with the GEM Detector Assembly Lines for the CMS Forward Muon Upgrade [journal article - articolo]. In IEEE TRANSACTIONS ON NUCLEAR SCIENCE. Retrieved from http://hdl.handle.net/10446/144958
File allegato/i alla scheda:
File Dimensione del file Formato  
08469076.pdf

Solo gestori di archivio

Versione: publisher's version - versione editoriale
Licenza: Licenza default Aisberg
Dimensione del file 2.11 MB
Formato Adobe PDF
2.11 MB Adobe PDF   Visualizza/Apri
Pubblicazioni consigliate

Aisberg ©2008 Servizi bibliotecari, Università degli studi di Bergamo | Terms of use/Condizioni di utilizzo

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/10446/144958
Citazioni
  • Scopus 3
  • ???jsp.display-item.citation.isi??? 3
social impact