Triple-GEM detector technology was recently selected by CMS for a part of the upgrade of its forward muon detector system as GEM detectors provide a stable operation in the high radiation environment expected during the future High-Luminosity phase of the Large Hadron Collider (HL-LHC). In a first step, GEM chambers (detectors) will be installed in the innermost muon endcap station in the 1.6<2.2 pseudo-rapidity region, mainly to control level-1 muon trigger rates after the second LHC Long Shutdown. These new chambers will add redundancy to the muon system in the η-region where the background rates are high, and the bending of the muon trajectories due to the CMS magnetic field is small. A novel construction technique for such chambers has been developed in such a way where foils are mounted onto a single stack and then uniformly stretched mechanically, avoiding the use of spacers and glue inside the active gas volume. We describe the layout, the stretching mechanism and the overall assembly technique of such GEM chambers.

(2019). Layout and assembly technique of the GEM chambers for the upgrade of the CMS first muon endcap station [journal article - articolo]. In NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH. SECTION A, ACCELERATORS, SPECTROMETERS, DETECTORS AND ASSOCIATED EQUIPMENT. Retrieved from http://hdl.handle.net/10446/145040

Layout and assembly technique of the GEM chambers for the upgrade of the CMS first muon endcap station

Vai I.;
2019-01-01

Abstract

Triple-GEM detector technology was recently selected by CMS for a part of the upgrade of its forward muon detector system as GEM detectors provide a stable operation in the high radiation environment expected during the future High-Luminosity phase of the Large Hadron Collider (HL-LHC). In a first step, GEM chambers (detectors) will be installed in the innermost muon endcap station in the 1.6<2.2 pseudo-rapidity region, mainly to control level-1 muon trigger rates after the second LHC Long Shutdown. These new chambers will add redundancy to the muon system in the η-region where the background rates are high, and the bending of the muon trajectories due to the CMS magnetic field is small. A novel construction technique for such chambers has been developed in such a way where foils are mounted onto a single stack and then uniformly stretched mechanically, avoiding the use of spacers and glue inside the active gas volume. We describe the layout, the stretching mechanism and the overall assembly technique of such GEM chambers.
articolo
2019
Abbaneo, D.; Abbas, M.; Abbrescia, M.; Abdalla, H.; Ahmad, A.; Ahmed, A.; Ahmed, W.; Ali, C.; Asghar, I.; Aspell, P.; Assran, Y.; Avila, C.; Ban, Y.; Band, R.; Bansal, S.; Bencze, G.; Beni, N.; Benussi, L.; Bhatnagar, V.; Bhopatkar, V.; Bianco, M.; Bianco, S.; Borgonovi, L.; Bouhali, O.; Braghieri, A.; Braibant-Giacomelli, S.; Bravo, C.; Cafaro, V.; Calabria, C.; Salazar, C.; Caponero, M.; Cassese, F.; Hernandez, A.; Cavallo, F.; Cavallo, N.; Choi, Y.; Colafranceschi, S.; Colaleo, A.; Garcia, A. C.; Dalchenko, M.; De Lentdecker, G.; Dell Olio, D.; De Robertis, G.; Dildick, S.; Dorney, B.; Endroczi, G.; Erbacher, R.; Errico, F.; Fallavollita, F.; Fontanesi, E.; Franco, M.; Giacomelli, P.; Gigli, S.; Gilmore, J.; Giordano, V.; Gola, M.; Gruchala, M.; Guiducci, L.; Gupta, R.; Gutierrez, A.; Hadjiiska, R.; Hakkarainen, T.; Hauser, J.; Heidemann, C.; Hoepfner, K.; Hohlmann, M.; Hoorani, H.; Huang, H.; Huang, Q.; Huang, T.; Iaydjiev, P.; Inseok, Y.; Irshad, A.; Jeng, Y.; Jha, V.; Juodagalvis, A.; Juska, E.; Kamon, T.; Karchin, P.; Kaur, A.; Keller, H.; Khan, W.; Kim, J.; Kim, H.; King, R.; Kumar, A.; Kumari, P.; Lacalamita, N.; Lee, J.; Lenzi, T.; Leonard, A.; Levin, A.; Li, Q.; Licciulli, F.; Litov, L.; Loddo, F.; Lohan, M.; Maggi, M.; Magnani, A.; Majumdar, N.; Malhotra, S.; Marinov, A.; Martirodonna, S.; Mccoll, N.; Mclean, C.; Merlin, J.; Mishra, D.; Mocellin, G.; Mohamed, S.; Mohamed, T.; Molnar, J.; Moureaux, L.; Muhammad, S.; Mukhopadhyay, S.; Murtaza, S.; Naimuddin, M.; Vanegas, N.; Netrakanti, P.; Nuzzo, S.; Oliveira, R.; Pant, L.; Paolucci, P.; Park, I.; Passamonti, L.; Passeggio, G.; Pastore, C.; Pavlov, B.; Peck, A.; Petrow, H.; Philipps, B.; Piccolo, D.; Pierluigi, D.; Primavera, F.; Radogna, R.; Raffone, G.; Rahmani, M.; Ranieri, A.; Rapsevicius, V.; Rashevski, G.; Ressegotti, M.; Riccardi, C.; Rodozov, M.; Romano, E.; Roskas, C.; Rout, P.; Russo, A.; Safonov, A.; Saltzberg, D.; Saviano, G.; Shah, A. H.; Sharma, A.; Sharma, R.; Shopova, M.; Simone, F.; Singh, J. B.; Soldani, E.; Starling, E.; Sturdy, J.; Sultan, A.; Sultanov, G.; Szillasi, Z.; Thyssen, F.; Tuuva, T.; Tytgat, M.; Ujvari, B.; Vai, Ilaria; Venditti, R.; Verwilligen, P.; Vitulo, P.; Wang, D.; Yang, Y.; Yang, U.; Yonamine, R.; Yu, I.; Zaleski, S.
(2019). Layout and assembly technique of the GEM chambers for the upgrade of the CMS first muon endcap station [journal article - articolo]. In NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH. SECTION A, ACCELERATORS, SPECTROMETERS, DETECTORS AND ASSOCIATED EQUIPMENT. Retrieved from http://hdl.handle.net/10446/145040
File allegato/i alla scheda:
File Dimensione del file Formato  
1-s2.0-S0168900218316371-main.pdf

Solo gestori di archivio

Versione: publisher's version - versione editoriale
Licenza: Licenza default Aisberg
Dimensione del file 4.82 MB
Formato Adobe PDF
4.82 MB Adobe PDF   Visualizza/Apri
Pubblicazioni consigliate

Aisberg ©2008 Servizi bibliotecari, Università degli studi di Bergamo | Terms of use/Condizioni di utilizzo

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/10446/145040
Citazioni
  • Scopus 14
  • ???jsp.display-item.citation.isi??? 14
social impact