We propose a multi-stage stochastic optimisation model for the generation capacity expansion problem of a price-taker power producer. Uncertainties regarding the evolution of electricity prices and fuel costs play a major role in long term investment decisions, therefore the objective function represents a trade-off between expected profit and risk. The Conditional Value at Risk is the risk measure used and is defined by a nested formulation that guarantees time consistency in the multi-stage model. The proposed model allows one to determine a long term expansion plan which takes into account uncertainty, while the LCoE approach, currently used by decision makers, only allows one to determine which technology should be chosen for the next power plant to be built. A sensitivity analysis is performed with respect to the risk weighting factor and budget amount.
(2019). A Time Consistent Risk Averse Three-Stage Stochastic Mixed Integer Optimisation Model for Power Generation Capacity Expansion . Retrieved from http://hdl.handle.net/10446/152425
A Time Consistent Risk Averse Three-Stage Stochastic Mixed Integer Optimisation Model for Power Generation Capacity Expansion
Pisciella, P.;Vespucci, M. T.;Zigrino, S.
2019-01-01
Abstract
We propose a multi-stage stochastic optimisation model for the generation capacity expansion problem of a price-taker power producer. Uncertainties regarding the evolution of electricity prices and fuel costs play a major role in long term investment decisions, therefore the objective function represents a trade-off between expected profit and risk. The Conditional Value at Risk is the risk measure used and is defined by a nested formulation that guarantees time consistency in the multi-stage model. The proposed model allows one to determine a long term expansion plan which takes into account uncertainty, while the LCoE approach, currently used by decision makers, only allows one to determine which technology should be chosen for the next power plant to be built. A sensitivity analysis is performed with respect to the risk weighting factor and budget amount.File | Dimensione del file | Formato | |
---|---|---|---|
2019 Book-chapter.pdf
Solo gestori di archivio
Versione:
publisher's version - versione editoriale
Licenza:
Licenza default Aisberg
Dimensione del file
2.41 MB
Formato
Adobe PDF
|
2.41 MB | Adobe PDF | Visualizza/Apri |
Pubblicazioni consigliate
Aisberg ©2008 Servizi bibliotecari, Università degli studi di Bergamo | Terms of use/Condizioni di utilizzo