In this paper, we study a single-sink transportation problem in which the production capacity of the suppliers and the demand of the single customer are stochastic. Shipments are performed by capacitated vehicles, which have to be booked in advance, before the realization of the production capacity and the demand. Once the production capacity and the demand are revealed, there is an option to cancel some of the booked vehicles against a cancellation fee; if the quantity shipped from the suppliers using the booked vehicles is not enough to satisfy the demand, the residual quantity is purchased from an external company. The problem is to determine the number of vehicles to book in order to minimize the total cost. We formulate a two-stage and a multistage stochastic mixed integer linear programming models to solve this problem and test them on a real case provided by Italcementi, the primary Italian cement producer and the fifth largest cement producer in the world. We test the influence of different scenario-tree structures on the solutions of the problem, as well as sensitivity of the results with respect to the cancellation fee.

Stochastic optimization models for a single-sink transportation problem

MAGGIONI, Francesca;
2009-01-01

Abstract

In this paper, we study a single-sink transportation problem in which the production capacity of the suppliers and the demand of the single customer are stochastic. Shipments are performed by capacitated vehicles, which have to be booked in advance, before the realization of the production capacity and the demand. Once the production capacity and the demand are revealed, there is an option to cancel some of the booked vehicles against a cancellation fee; if the quantity shipped from the suppliers using the booked vehicles is not enough to satisfy the demand, the residual quantity is purchased from an external company. The problem is to determine the number of vehicles to book in order to minimize the total cost. We formulate a two-stage and a multistage stochastic mixed integer linear programming models to solve this problem and test them on a real case provided by Italcementi, the primary Italian cement producer and the fifth largest cement producer in the world. We test the influence of different scenario-tree structures on the solutions of the problem, as well as sensitivity of the results with respect to the cancellation fee.
journal article - articolo
2009
Maggioni, Francesca; Kaut, Michal; Bertazzi, Luca
File allegato/i alla scheda:
File Dimensione del file Formato  
Maggioni_Kaut_Bertazzi_ima09.pdf

Solo gestori di archivio

Versione: publisher's version - versione editoriale
Licenza: Licenza default Aisberg
Dimensione del file 378.45 kB
Formato Adobe PDF
378.45 kB Adobe PDF   Visualizza/Apri
Pubblicazioni consigliate

Aisberg ©2008 Servizi bibliotecari, Università degli studi di Bergamo | Terms of use/Condizioni di utilizzo

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/10446/22795
Citazioni
  • Scopus 18
  • ???jsp.display-item.citation.isi??? ND
social impact