The present paper analyses an interesting case study of the application of dynamic energy simulation on the energy efficiency improvement process of an existing large hospital building with a starting low level of energy efficiency. Object of the analysis are interventions on the envelope, maximum thermal power requirements and the installation of a cogeneration machine. Great attention is dedicated on the correct sizing of the CHP equipment both in the energy efficiency and economic aspects. The study is based on the modeling of the existing building as a baseline case and the evaluation of various interventions through dynamic energy simulation. The work proves the usefulness of dynamic energy simulation as an evaluation tool for effectiveness of energy efficiency improvement in refurbishment projects and provides suggestions on the correct sizing of plant and CHP equipment.

(2012). Energy simulations for energy efficiency improvement of an existing private clinic in North Italy [conference presentation - intervento a convegno]. Retrieved from http://hdl.handle.net/10446/28102

Energy simulations for energy efficiency improvement of an existing private clinic in North Italy

PICCO, Marco;MARENGO, Marco
2012-09-01

Abstract

The present paper analyses an interesting case study of the application of dynamic energy simulation on the energy efficiency improvement process of an existing large hospital building with a starting low level of energy efficiency. Object of the analysis are interventions on the envelope, maximum thermal power requirements and the installation of a cogeneration machine. Great attention is dedicated on the correct sizing of the CHP equipment both in the energy efficiency and economic aspects. The study is based on the modeling of the existing building as a baseline case and the evaluation of various interventions through dynamic energy simulation. The work proves the usefulness of dynamic energy simulation as an evaluation tool for effectiveness of energy efficiency improvement in refurbishment projects and provides suggestions on the correct sizing of plant and CHP equipment.
set-2012
Picco, Marco; Marengo, Marco
File allegato/i alla scheda:
File Dimensione del file Formato  
6B2.pdf

Solo gestori di archivio

Descrizione: publisher's version - versione dell'editore
Dimensione del file 864.44 kB
Formato Adobe PDF
864.44 kB Adobe PDF   Visualizza/Apri
Pubblicazioni consigliate

Aisberg ©2008 Servizi bibliotecari, Università degli studi di Bergamo | Terms of use/Condizioni di utilizzo

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/10446/28102
Citazioni
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact