The Recovery Plan of Bergamo Alta, approved in 1935, was the outcome of a complex planning process that began in 1926. Resolving the long-standing problem of the city's sanitary conditions, which had already been denounced since the late 19th century, was possible thanks to the tenacity of the municipal administrators and podestà and the expertise of the designer, engineer Luigi Angelini.

(2025). Il piano di risanamento di Bergamo alta: i Podestà e l’ingegnere . Retrieved from https://hdl.handle.net/10446/305726

Il piano di risanamento di Bergamo alta: i Podestà e l’ingegnere

Resmini, Monica
2025-01-01

Abstract

The Recovery Plan of Bergamo Alta, approved in 1935, was the outcome of a complex planning process that began in 1926. Resolving the long-standing problem of the city's sanitary conditions, which had already been denounced since the late 19th century, was possible thanks to the tenacity of the municipal administrators and podestà and the expertise of the designer, engineer Luigi Angelini.
2025
Resmini, Monica
File allegato/i alla scheda:
File Dimensione del file Formato  
_RESMINI_Beyond the Gaze_1.pdf

accesso aperto

Versione: publisher's version - versione editoriale
Licenza: Creative commons
Dimensione del file 1.36 MB
Formato Adobe PDF
1.36 MB Adobe PDF Visualizza/Apri
Pubblicazioni consigliate

Aisberg ©2008 Servizi bibliotecari, Università degli studi di Bergamo | Terms of use/Condizioni di utilizzo

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/10446/305726
Citazioni
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact