This paper illustrates the results of an empirical study involving 21 engineer-to-order (ETO) companies, operating in the machinery-building industry. The study investigates the needs and requirements of such companies in terms of software support for governing the businesses, with particular emphasis on production planning and control (PPC) processes. An empirical analysis investigated two main aspects: (i) the set of business activities performed by the companies in the analysed industry and (ii) the relevant, high-level software functionalities required for the execution of such activities. As an answer to the observed compelling need for reviewing the general approaches to PPC in machinery-building companies, we develop an empirical, high-level production planning and scheduling reference framework, encompassing all the activities involved in the order fulfilment process.

(2015). Engineer-to-order (ETO) production planning and control: an empirical framework for machinery-building companies [journal article - articolo]. In PRODUCTION PLANNING & CONTROL. Retrieved from http://hdl.handle.net/10446/58060

Engineer-to-order (ETO) production planning and control: an empirical framework for machinery-building companies

PINTO, Roberto;PIROLA, Fabiana;
2015-01-01

Abstract

This paper illustrates the results of an empirical study involving 21 engineer-to-order (ETO) companies, operating in the machinery-building industry. The study investigates the needs and requirements of such companies in terms of software support for governing the businesses, with particular emphasis on production planning and control (PPC) processes. An empirical analysis investigated two main aspects: (i) the set of business activities performed by the companies in the analysed industry and (ii) the relevant, high-level software functionalities required for the execution of such activities. As an answer to the observed compelling need for reviewing the general approaches to PPC in machinery-building companies, we develop an empirical, high-level production planning and scheduling reference framework, encompassing all the activities involved in the order fulfilment process.
articolo
2015
Adrodegari, Federico; Bacchetti, Andrea; Pinto, Roberto; Pirola, Fabiana; Zanardini, Massimo
(2015). Engineer-to-order (ETO) production planning and control: an empirical framework for machinery-building companies [journal article - articolo]. In PRODUCTION PLANNING & CONTROL. Retrieved from http://hdl.handle.net/10446/58060
File allegato/i alla scheda:
File Dimensione del file Formato  
Engineer to order ETO production planning.pdf

Solo gestori di archivio

Versione: publisher's version - versione editoriale
Licenza: Licenza default Aisberg
Dimensione del file 1.04 MB
Formato Adobe PDF
1.04 MB Adobe PDF   Visualizza/Apri
58060 Pirola.pdf

Open Access dal 14/05/2016

Descrizione: “This is an Accepted Manuscript of an article published by Taylor & Francis in PRODUCTION PLANNING & CONTROL on 14 May 2015, available online: http://www.tandfonline.com/http://dx.doi.org/10.1080/09537287.2014.1001808”
Versione: postprint - versione referata/accettata senza referaggio
Licenza: Creative commons
Dimensione del file 3.03 MB
Formato Adobe PDF
3.03 MB Adobe PDF Visualizza/Apri
Pubblicazioni consigliate

Aisberg ©2008 Servizi bibliotecari, Università degli studi di Bergamo | Terms of use/Condizioni di utilizzo

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/10446/58060
Citazioni
  • Scopus 63
  • ???jsp.display-item.citation.isi??? 48
social impact