The present paper deals with the results of one month monitoring campaign of operating regimes of an existing ac arc furnace facility and its impact on power quality. Synchronized measurements were carried on in different points of the supply system of the arc furnace facility. Different supply schemes of the electric arc furnace facility were proposed and implemented, monitoring the power quality indices in seven points.

(2016). Flicker monitoring campaign in EAF facilities equipped with STATCOM . In PROCEEDINGS - INTERNATIONAL CONFERENCE ON HARMONICS AND QUALITY OF POWER. Retrieved from http://hdl.handle.net/10446/83483

Flicker monitoring campaign in EAF facilities equipped with STATCOM

Roscia, Mariacristina
2016-01-01

Abstract

The present paper deals with the results of one month monitoring campaign of operating regimes of an existing ac arc furnace facility and its impact on power quality. Synchronized measurements were carried on in different points of the supply system of the arc furnace facility. Different supply schemes of the electric arc furnace facility were proposed and implemented, monitoring the power quality indices in seven points.
2016
Lazaroiu, George Cristian; Golovanov, Nicolae; Elefterescu, Luminita; Zaninelli, Dario; Roscia, Mariacristina
File allegato/i alla scheda:
File Dimensione del file Formato  
07783407_roscia.pdf

Solo gestori di archivio

Versione: publisher's version - versione editoriale
Licenza: Licenza default Aisberg
Dimensione del file 959.9 kB
Formato Adobe PDF
959.9 kB Adobe PDF   Visualizza/Apri
Pubblicazioni consigliate

Aisberg ©2008 Servizi bibliotecari, Università degli studi di Bergamo | Terms of use/Condizioni di utilizzo

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/10446/83483
Citazioni
  • Scopus 2
  • ???jsp.display-item.citation.isi??? 1
social impact