Our study focuses on companies operating according to an Engineer-To-Order (ETO) strategy, where each product has a distinctive degree of customization according to specific customer requirements. Due to the main features of ETO context (low level of repetitiveness and high responsiveness to customers' requirements changes), companies need different managerial paradigms and ICT tools compared to mass production companies. Duplicating methods implemented for repetitive production may not yield the same benefits for ETO. The main consequence of the lack of specific organizational and managerial approaches for ETO results in the incidence of rework required in projects, with consequent time-to-finish delays and increased costs. Through the 21 industrial case studies performed, we identified a compelling need for reviewing the general approaches to the planning, scheduling, and control tasks in ETO companies. This need led us to devise an ideal framework encompasses all the activities involved in the order fulfillment process referred to these critical processes. Therefore, starting from the maps of the ETO companies processes, we outlined a general reference model aiming at assisting company management in the review of their processes.

(2013). An empirical production-planning & control framework for engineer-to-order companies . In ...SUMMER SCHOOL FRANCESCO TURCO. PROCEEDINGS. Retrieved from http://hdl.handle.net/10446/84320

An empirical production-planning & control framework for engineer-to-order companies

PINTO, Roberto;PIROLA, Fabiana;
2013-01-01

Abstract

Our study focuses on companies operating according to an Engineer-To-Order (ETO) strategy, where each product has a distinctive degree of customization according to specific customer requirements. Due to the main features of ETO context (low level of repetitiveness and high responsiveness to customers' requirements changes), companies need different managerial paradigms and ICT tools compared to mass production companies. Duplicating methods implemented for repetitive production may not yield the same benefits for ETO. The main consequence of the lack of specific organizational and managerial approaches for ETO results in the incidence of rework required in projects, with consequent time-to-finish delays and increased costs. Through the 21 industrial case studies performed, we identified a compelling need for reviewing the general approaches to the planning, scheduling, and control tasks in ETO companies. This need led us to devise an ideal framework encompasses all the activities involved in the order fulfillment process referred to these critical processes. Therefore, starting from the maps of the ETO companies processes, we outlined a general reference model aiming at assisting company management in the review of their processes.
2013
Inglese
Proceedings of the 18th Summer School Francesco Turco 2013
11
285
290
file su supporto
Italy
AIDI - Italian Association of Industrial Operations Professors
esperti anonimi
18th Summer School Francesco Turco 2013
Senigallia; Italy
11 -13 September 2013
Università Politecnica delle Marche
nazionale
contributo
Settore ING-IND/17 - Impianti Industriali Meccanici
Empirical framework; Engineer-to-order (ETO); Production planning & control (PPC); Business and International Management; Management of Technology and Innovation; Organizational Behavior and Human Resource Management; Strategy and Management1409 Tourism, Leisure and Hospitality Management; Management Science and Operations Research; Industrial and Manufacturing Engineering; Safety, Risk, Reliability and Quality; Waste Management and Disposal
info:eu-repo/semantics/conferenceObject
5
Adrodegari, Federico; Bacchetti, Andrea; Pinto, Roberto; Pirola, Fabiana; Zanardini, Massimo
1.4 Contributi in atti di convegno - Contributions in conference proceedings::1.4.01 Contributi in atti di convegno - Conference presentations
none
no full text
273
(2013). An empirical production-planning & control framework for engineer-to-order companies . In ...SUMMER SCHOOL FRANCESCO TURCO. PROCEEDINGS. Retrieved from http://hdl.handle.net/10446/84320
File allegato/i alla scheda:
Non ci sono file allegati a questa scheda.
Pubblicazioni consigliate

Aisberg ©2008 Servizi bibliotecari, Università degli studi di Bergamo | Terms of use/Condizioni di utilizzo

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/10446/84320
Citazioni
  • Scopus 0
  • ???jsp.display-item.citation.isi??? ND
social impact