Increasing intermittent renewable generation to meet the climate goals entails a deep transformation of current power systems. The transmission system must adapt to ensure a rapid and flexible response to the changes in the energy flows. Flexibility can be provided by reinforcing the interconnection among all the market agents and/or by installing facilities with fast response to the changes. In this work, we study the investment problem of a central planner that seeks to expand the transmission network and install storage units considering decarbonizing measures. We propose a two-stage stochastic problem with uncertainty on the demand growth and including representative days to characterize the hourly demand and renewable power variability. To obtain better expansion strategies according to a limit on the carbon emissions, second-order stochastic dominance constraints are imposed. Numerical analyses based on the power system of the Canary island (Spain) are provided. The results show that to install storage units is key to efficiently integrate renewable generation. The investments in the transmission system are mostly in lower-voltage lines. The formulation with stochastic dominance constraints results in higher second-stage investments, allowing a better adaptation to the demand growth evolution.
(2024). Investments in transmission lines and storage units considering second-order stochastic dominance constraints [journal article - articolo]. In ENERGY ECONOMICS. Retrieved from https://hdl.handle.net/10446/270089
Investments in transmission lines and storage units considering second-order stochastic dominance constraints
Vitali, Sebastiano
2024-01-01
Abstract
Increasing intermittent renewable generation to meet the climate goals entails a deep transformation of current power systems. The transmission system must adapt to ensure a rapid and flexible response to the changes in the energy flows. Flexibility can be provided by reinforcing the interconnection among all the market agents and/or by installing facilities with fast response to the changes. In this work, we study the investment problem of a central planner that seeks to expand the transmission network and install storage units considering decarbonizing measures. We propose a two-stage stochastic problem with uncertainty on the demand growth and including representative days to characterize the hourly demand and renewable power variability. To obtain better expansion strategies according to a limit on the carbon emissions, second-order stochastic dominance constraints are imposed. Numerical analyses based on the power system of the Canary island (Spain) are provided. The results show that to install storage units is key to efficiently integrate renewable generation. The investments in the transmission system are mostly in lower-voltage lines. The formulation with stochastic dominance constraints results in higher second-stage investments, allowing a better adaptation to the demand growth evolution.File | Dimensione del file | Formato | |
---|---|---|---|
1-s2.0-S0140988324003153-main.pdf
accesso aperto
Versione:
publisher's version - versione editoriale
Licenza:
Creative commons
Dimensione del file
900.39 kB
Formato
Adobe PDF
|
900.39 kB | Adobe PDF | Visualizza/Apri |
Pubblicazioni consigliate
Aisberg ©2008 Servizi bibliotecari, Università degli studi di Bergamo | Terms of use/Condizioni di utilizzo